Sold · Datacenter
Dairy Ashford Data Center — 14 MW live
Power
14 MW live on the grid
Built, permitted, and operational. ~1.3 MW Detroit diesel backup generator (~500 operating hours; fuel tanks not currently installed).
Facility
- Raised-floor data center with water-cooling infrastructure installed
- Fiber-optic internet available on-site
- Covered dock access; fenced and gated with access control
- Security system with multiple exterior and interior cameras
- Five offices; large break room; conference room; two restrooms (one with shower)
- Ample surface parking
Source listing (historical): LoopNet 12626A Dairy Ashford. Photos from that listing. No asking price is published on the source page.






